ITAC Assessment: TN0371
ITAC logo
ITAC Assessment: TN0371
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product FIBERGLASS PLASTICS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 7,600
ton
Production Hrs. Annual 6,240
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $191,730 3,973,916
kWh
Natural Gas $69,128 19,512
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,986 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,986

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4237: Substitute compressed air cooling with water or air cooling $24,816 $13,460 $24,816
516,999
kWh
-
02 2.2135: Repair and eliminate steam leaks $5,334 $600 - $5,334
-
MMBtu
03 2.2163: Use minimum steam operating pressure $2,783 - - $2,783
-
MMBtu
04 2.7314: Reduce ventilation air $10,059 $3,100 $10,059
209,555
kWh
-
05 2.2437: Recover waste heat from equipment $2,475 $3,050 - $2,475
-
MMBtu
06 2.2511: Insulate bare equipment $7,555 $536 $7,555
157,386
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,305 $660 $4,305
89,683
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,659 - $2,659
55,393
kWh
-
TOTAL RECOMMENDED $59,986 $21,406 $49,394
1,029,016
kWh
$10,592
-
MMBtu
TOTAL IMPLEMENTED $59,986 $21,406 $49,394
1,029,016
kWh
$10,592
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs