Assessment Year | 2010 |
---|---|
Principal Product | Reusable Plastic Containers |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 240 |
Plant Area |
289,000
ft2
|
Annual Production | 90
units
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,316,406 | 35,980,127 |
kWh
|
$0.064 |
Electricity Demand | $837,098 | 71,664 |
kW-mo/yr
|
$11.68 |
Electricity Fees | $8,162 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $189,022 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $127,417 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $67,934 | $1,710 |
$67,934
1,054,222
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $41,306 | $7,308 |
$31,354
486,862
kWh
|
$9,952
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,177 | $4,500 |
$13,995
217,319
kWh
|
$4,182
-
kW-mo/yr
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $41,138 | $14,750 |
$41,138
638,799
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,815 | $16,270 |
$6,815
105,865
kWh
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,490 | $10,074 |
$5,490
65,370
kWh
|
- | |
07 | 2.3212: Optimize plant power factor | $8,162 | $31,629 |
$8,162
36,920
kWh
|
- | |
TOTAL RECOMMENDED | $189,022 | $86,241 |
$174,888
2,605,357
kWh
|
$14,134
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $127,417 | $13,518 |
$113,283
1,758,403
kWh
|
$14,134
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs