ITAC Assessment: SD0424
ITAC logo
ITAC Assessment: SD0424
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Reusable Plastic Containers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 240
Plant Area 289,000
ft2
Annual Production 90
units
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,316,406 35,980,127
kWh
Electricity Demand $837,098 71,664
kW-mo/yr
Electricity Fees $8,162 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $189,022 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $127,417

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.1121: Use insulation in furnaces to facilitate heating / cooling $67,934 $1,710 $67,934
1,054,222
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $41,306 $7,308 $31,354
486,862
kWh
$9,952
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,177 $4,500 $13,995
217,319
kWh
$4,182
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $41,138 $14,750 $41,138
638,799
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,815 $16,270 $6,815
105,865
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,490 $10,074 $5,490
65,370
kWh
-
07 2.3212: Optimize plant power factor $8,162 $31,629 $8,162
36,920
kWh
-
TOTAL RECOMMENDED $189,022 $86,241 $174,888
2,605,357
kWh
$14,134
-
kW-mo/yr
TOTAL IMPLEMENTED $127,417 $13,518 $113,283
1,758,403
kWh
$14,134
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs