ITAC Assessment: KU0113
ITAC logo
ITAC Assessment: KU0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product FOOD PROC. EQUIPMENT
NAICS
n/a
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 1,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,517 518,757
kWh
Natural Gas $17,062 3,214
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,869 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,074

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,125 $5,708 $3,125
41,032
kWh
- -
02 2.1222: Install turbulators $558 $1,100 - $558
-
MMBtu
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $523 $1,010 - $523
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $431 $200 - $831
-
MMBtu
$(-400.0)
05 2.1123: Install automatic stack damper $120 $160 - $120
-
MMBtu
-
06 2.7261: Install timers and/or thermostats $112 $100 $112
1,465
kWh
- -
TOTAL RECOMMENDED $4,869 $8,278 $3,237
42,497
kWh
$2,032
-
MMBtu
$(-400.0)
TOTAL IMPLEMENTED $1,074 $1,370 - $1,474
-
MMBtu
$(-400.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs