ITAC Assessment: MO0242
ITAC logo
ITAC Assessment: MO0242
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Decorative Foil and Film Packaging Products
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 171,000
ft2
Annual Production 250,000,000
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,162 1,412,954
kWh
Electricity Demand $38,419 458
kW-mo/yr
Electricity Fees $6,446 -
Natural Gas $35,392 7,712
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,920 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,496

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $489 $345 - - - $489
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,386 $5,555 $3,961
77,081
kWh
$1,425
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,073 $120 $738
14,361
kWh
$335
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $808 $175 $557
10,844
kWh
$251
-
kW-mo/yr
- -
05 2.4133: Use most efficient type of electric motors $3,422 $4,634 $2,500
48,652
kWh
$922
-
kW-mo/yr
- -
06 3.5217: Reuse / recycle/ sell paper products $616 - - - $616
-
lb
-
07 3.5212: Regrind, reuse, or sell scrap plastic parts $126 - - - $126
-
lb
-
TOTAL RECOMMENDED $11,920 $10,829 $7,756
150,938
kWh
$2,933
-
kW-mo/yr
$742
-
lb
$489
TOTAL IMPLEMENTED $10,496 $10,654 $7,199
140,094
kWh
$2,682
-
kW-mo/yr
$126
-
lb
$489
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs