ITAC Assessment: MZ0216
ITAC logo
ITAC Assessment: MZ0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Processed meat (ham, rib, bacon, sausage, seafood, lamb, and game birds)
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 140,000
ft2
Annual Production 15,000
ton
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,291 1,796,900
kWh
Electricity Demand $53,358 6,523
kW-mo/yr
Natural Gas $53,982 19,886
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,026 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,778

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $859 $1,000 $622
9,215
kWh
$237
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $4,373 $12,000 $4,373
64,784
kWh
- -
03 2.1131: Repair faulty insulation in furnaces, boilers, etc $404 $800 - - $404
-
MMBtu
04 2.7135: Install occupancy sensors $389 $280 $389
5,760
kWh
- -
05 2.2121: Increase amount of condensate returned $2,001 $2,000 - - $2,001
-
MMBtu
TOTAL RECOMMENDED $8,026 $16,080 $5,384
79,759
kWh
$237
-
kW-mo/yr
$2,405
-
MMBtu
TOTAL IMPLEMENTED $6,778 $14,800 $4,373
64,784
kWh
- $2,405
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs