ITAC Assessment: NL0073
ITAC logo
ITAC Assessment: NL0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 7
Plant Area 300,000
ft2
Annual Production 584,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,986 1,592,983
kWh
Electricity Demand $24,827 1,439
kW-mo/yr
Natural Gas $99,142 10,312
MMBtu
Waste Disposal Costs
Water Usage $62,860 9,280
Tgal
Solid Waste (non-haz) $44,389 493,200
lb
TOTAL YEARLY COSTS $325,204
RECOMMENDED SAVINGS* $30,908 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,670

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4323: Use optimum size and capacity equipment $16,217 $225,000 $11,580
196,224
kWh
$4,637
-
kW-mo/yr
- - -
02 2.6231: Utilize controls to operate equipment only when needed $7,537 $35,000 $1,106
18,746
kWh
$443
-
kW-mo/yr
- - $5,988
03 2.4322: Use or replace with energy efficient substitutes $5,239 $1,398 $(-382.4)
(-6,481)
kWh
$5,621
-
kW-mo/yr
- - -
04 3.3133: Use other waste concentration methods $1,144 $1,258 - - $(-1,075.0)
-
MMBtu
$2,219
-
lb
-
05 2.4239: Eliminate or reduce compressed air usage $772 $58 - $772
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $30,908 $262,714 $12,304
208,489
kWh
$11,473
-
kW-mo/yr
$(-1,075.0)
-
MMBtu
$2,219
-
lb
$5,988
TOTAL IMPLEMENTED $25,670 $261,316 $12,686
214,970
kWh
$5,852
-
kW-mo/yr
$(-1,075.0)
-
MMBtu
$2,219
-
lb
$5,988
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs