| Assessment Year | 2022 |
|---|---|
| Principal Product | Treated Wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $1 M to 5M |
| # of Employees | 7 |
| Plant Area |
300,000
ft2
|
| Annual Production | 584,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Minnesota |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $93,986 | 1,592,983 |
kWh
|
$0.059 | |
| Electricity Demand | $24,827 | 1,439 |
kW-mo/yr
|
$17.25 | |
| Natural Gas | $99,142 | 10,312 |
MMBtu
|
$9.61 | |
| Waste Disposal Costs | |||||
| Water Usage | $62,860 | 9,280 |
Tgal
|
$6.77 | |
| Solid Waste (non-haz) | $44,389 | 493,200 |
lb
|
$0.090 | |
| TOTAL YEARLY COSTS | $325,204 | ||||
| RECOMMENDED SAVINGS* | $30,908 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $25,670 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4323: Use optimum size and capacity equipment | $16,217 | $225,000 |
$11,580
196,224
kWh
|
$4,637
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.6231: Utilize controls to operate equipment only when needed | $7,537 | $35,000 |
$1,106
18,746
kWh
|
$443
-
kW-mo/yr
|
- | - | $5,988 | |
| 03 | 2.4322: Use or replace with energy efficient substitutes | $5,239 | $1,398 |
$(-382.4)
(-6,481)
kWh
|
$5,621
-
kW-mo/yr
|
- | - | - | |
| 04 | 3.3133: Use other waste concentration methods | $1,144 | $1,258 | - | - |
$(-1,075.0)
-
MMBtu
|
$2,219
-
lb
|
- | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $772 | $58 | - |
$772
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $30,908 | $262,714 |
$12,304
208,489
kWh
|
$11,473
-
kW-mo/yr
|
$(-1,075.0)
-
MMBtu
|
$2,219
-
lb
|
$5,988 | ||
| TOTAL IMPLEMENTED | $25,670 | $261,316 |
$12,686
214,970
kWh
|
$5,852
-
kW-mo/yr
|
$(-1,075.0)
-
MMBtu
|
$2,219
-
lb
|
$5,988 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs