ITAC Assessment: UF0250
ITAC logo
ITAC Assessment: UF0250
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Pre-Stressed Concrete Pipes
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 1,742,400
ft2
Annual Production 4,000
thousand feet
Production Hrs. Annual 2,210
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,662 992,673
kWh
Electricity Demand $34,899 4,013
kW-mo/yr
Natural Gas $23,549 4,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,059 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,622

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $4,768 $50 - - - - $4,768
02 2.4133: Use most efficient type of electric motors $151 $2,105 $73
1,758
kWh
$78
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $107 $275 $107
2,638
kWh
- - - -
04 2.2531: Re-size charging openings or add movable cover or door $2,340 $11,000 - - $2,340
-
MMBtu
- -
05 2.7261: Install timers and/or thermostats $142 $378 $142
3,517
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,454 $1,865 $1,218
29,601
kWh
$1,236
-
kW-mo/yr
- - -
07 3.5311: Recover and reuse waste material $57,590 - - - - $57,590
-
lb
-
08 3.5311: Recover and reuse waste material $20,000 - - - - $20,000
-
lb
-
09 4.711: Initiate a total quality management program $19,507 $8,590 - - - - $19,507
TOTAL RECOMMENDED $107,059 $24,263 $1,540
37,514
kWh
$1,314
-
kW-mo/yr
$2,340
-
MMBtu
$77,590
-
lb
$24,275
TOTAL IMPLEMENTED $27,622 $4,673 $1,540
37,514
kWh
$1,314
-
kW-mo/yr
- $20,000
-
lb
$4,768
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs