Assessment Year | 2019 |
---|---|
Principal Product | Injection Molded Plastic Parts |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 31 |
Plant Area |
36,000
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $72,081 | 806,408 |
kWh
|
$0.089 |
Electricity Demand | $8,125 | 2,227 |
kW-mo/yr
|
$3.65 |
Electricity Fees | $24,020 | - |
|
- |
Natural Gas | $5,810 | 738 |
MMBtu
|
$7.87 |
TOTAL YEARLY COSTS | $110,036 | |||
RECOMMENDED SAVINGS* | $11,708 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $710 | $25 |
$666
7,485
kWh
|
$44
-
kW-mo/yr
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,965 | $6,000 |
$3,728
41,895
kWh
|
$237
-
kW-mo/yr
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $290 | $743 |
$250
2,808
kWh
|
$40
-
kW-mo/yr
|
|
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $830 | $2,550 |
$756
8,379
kWh
|
$74
-
kW-mo/yr
|
|
05 | 2.7232: Replace existing hvac unit with high efficiency model | $5,413 | $21,000 |
$5,017
56,368
kWh
|
$396
-
kW-mo/yr
|
|
06 | 2.4221: Install compressor air intakes in coolest locations | $500 | $2,000 |
$463
5,197
kWh
|
$37
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $11,708 | $32,318 |
$10,880
122,132
kWh
|
$828
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs