| Assessment Year | 2003 |
|---|---|
| Principal Product | Valve manufacturer |
| NAICS | 332919: Other Metal Valve and Pipe Fitting Manufacturing |
| SIC | 3434: |
| Sales Range | $50 M to 100M |
| # of Employees | 220 |
| Plant Area |
190,000
ft2
|
| Annual Production | 11,000
ton
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $205,358 | 6,793,576 |
kWh
|
$0.030 |
| Electricity Demand | $96,186 | 13,551 |
kW-mo/yr
|
$7.10 |
| Electricity Fees | $15,910 | - |
|
- |
| Natural Gas | $74,527 | 11,883 |
MMBtu
|
$6.27 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $1,187,602 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,183,924 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,294 | $4,920 |
$6,927
230,447
kWh
|
- | $367 | - | |
| 02 | 2.7135: Install occupancy sensors | $3,678 | $364 |
$2,350
78,171
kWh
|
$1,143
-
kW-mo/yr
|
$185 | - | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $2,316 | $270 |
$1,449
48,204
kWh
|
$750
-
kW-mo/yr
|
$117 | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,189 | $1,050 |
$616
20,498
kWh
|
- | $33 | $540 | |
| 05 | 4.322: Eliminate old stock and modify inventory control | $1,170,000 | $15,240 | - | - | - | $1,170,000 | |
| 06 | 4.611: Begin a practice of predictive / preventative maintenance | $3,125 | $318 | - | - | - | $3,125 | |
| TOTAL RECOMMENDED | $1,187,602 | $22,162 |
$11,342
377,320
kWh
|
$1,893
-
kW-mo/yr
|
$702 | $1,173,665 | ||
| TOTAL IMPLEMENTED | $1,183,924 | $21,798 |
$8,992
299,149
kWh
|
$750
-
kW-mo/yr
|
$517 | $1,173,665 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs