ITAC Assessment: LL0171
ITAC logo
ITAC Assessment: LL0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Valve manufacturer
NAICS 332919: Other Metal Valve and Pipe Fitting Manufacturing
SIC 3434:
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 190,000
ft2
Annual Production 11,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $205,358 6,793,576
kWh
Electricity Demand $96,186 13,551
kW-mo/yr
Electricity Fees $15,910 -
Natural Gas $74,527 11,883
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,187,602 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,183,924

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,294 $4,920 $6,927
230,447
kWh
- $367 -
02 2.7135: Install occupancy sensors $3,678 $364 $2,350
78,171
kWh
$1,143
-
kW-mo/yr
$185 -
03 2.7111: Reduce illumination to minimum necessary levels $2,316 $270 $1,449
48,204
kWh
$750
-
kW-mo/yr
$117 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,189 $1,050 $616
20,498
kWh
- $33 $540
05 4.322: Eliminate old stock and modify inventory control $1,170,000 $15,240 - - - $1,170,000
06 4.611: Begin a practice of predictive / preventative maintenance $3,125 $318 - - - $3,125
TOTAL RECOMMENDED $1,187,602 $22,162 $11,342
377,320
kWh
$1,893
-
kW-mo/yr
$702 $1,173,665
TOTAL IMPLEMENTED $1,183,924 $21,798 $8,992
299,149
kWh
$750
-
kW-mo/yr
$517 $1,173,665
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs