| Assessment Year | 1982 |
|---|---|
| Principal Product | WIRE/STEEL PRODUCTS |
| NAICS |
n/a
|
| SIC | 3496: Miscellaneous Fabricated Wire Products |
| Sales Range | $10 M to 50M |
| # of Employees | 144 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 3,500
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $80,939 | 1,464,830 |
kWh
|
$0.055 |
| Natural Gas | $23,019 | 6,824 |
MMBtu
|
$3.37 |
| Fuel Oil #2 | $4,200 | 560 |
MMBtu
|
$7.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,485 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $162 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,357 | $302 |
$1,357
20,809
kWh
|
- | - | |
| 02 | 2.1332: Convert combustion equipment to burn natural gas | $2,534 | $6,200 | - |
$(-1,666.0)
-
MMBtu
|
$4,200
-
MMBtu
|
|
| 03 | 2.6121: Reduce hot water temperature to the minimum required | $162 | - |
$162
2,931
kWh
|
- | - | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,659 | $1,000 |
$4,659
-
kWh
|
- | - | |
| 05 | 2.7441: Replace broken windows and/or window sash | $773 | $752 | - |
$773
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $9,485 | $8,254 |
$6,178
23,740
kWh
|
$(-893.0)
-
MMBtu
|
$4,200
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $162 | - |
$162
2,931
kWh
|
- | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs