ITAC Assessment: UD0025
ITAC logo
ITAC Assessment: UD0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product WIRE/STEEL PRODUCTS
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 144
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 3,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,939 1,464,830
kWh
Natural Gas $23,019 6,824
MMBtu
Fuel Oil #2 $4,200 560
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,485 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $162

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,357 $302 $1,357
20,809
kWh
- -
02 2.1332: Convert combustion equipment to burn natural gas $2,534 $6,200 - $(-1,666.0)
-
MMBtu
$4,200
-
MMBtu
03 2.6121: Reduce hot water temperature to the minimum required $162 - $162
2,931
kWh
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,659 $1,000 $4,659
-
kWh
- -
05 2.7441: Replace broken windows and/or window sash $773 $752 - $773
-
MMBtu
-
TOTAL RECOMMENDED $9,485 $8,254 $6,178
23,740
kWh
$(-893.0)
-
MMBtu
$4,200
-
MMBtu
TOTAL IMPLEMENTED $162 - $162
2,931
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs