| Assessment Year | 1996 |
|---|---|
| Principal Product | Bottled Soft Drinks |
| NAICS |
n/a
|
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $50 M to 100M |
| # of Employees | 400 |
| Plant Area |
300,000
ft2
|
| Annual Production | 15,000,000
pieces
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $328,761 | 4,690,504 |
kWh
|
$0.070 |
| Electricity Demand | $84,906 | 10,865 |
kW-mo/yr
|
$7.81 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $111,769 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $29,311 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2622: Replace existing chiller with high efficiency model | $81,742 | $70,000 |
$54,846
783,705
kWh
|
$26,896
-
kW-mo/yr
|
- | |
| 02 | 2.7232: Replace existing hvac unit with high efficiency model | $716 | $1,750 |
$257
6,741
kWh
|
$459
-
kW-mo/yr
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $7,717 | $6,352 |
$6,303
89,977
kWh
|
$1,414
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,089 | $1,421 |
$1,821
26,084
kWh
|
$268
-
kW-mo/yr
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,677 | - |
$1,677
24,033
kWh
|
- | - | |
| 06 | 3.4113: Treat and reuse rinse waters | $17,828 | $1,300 | - | - |
$17,828
-
Tgal
|
|
| TOTAL RECOMMENDED | $111,769 | $80,823 |
$64,904
930,540
kWh
|
$29,037
-
kW-mo/yr
|
$17,828
-
Tgal
|
||
| TOTAL IMPLEMENTED | $29,311 | $9,073 |
$9,801
140,094
kWh
|
$1,682
-
kW-mo/yr
|
$17,828
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs