ITAC Assessment: OK1159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Geothermal Heat Exchangers
NAICS 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 53,000
ft2
Annual Production 65,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,472 883,800
kWh
Electricity Demand $28,876 2,831
kW-mo/yr
Natural Gas $27,905 8,666
MMBtu
TOTAL YEARLY COSTS $107,253
RECOMMENDED SAVINGS* $10,375 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $4,131 $5,755 - - $4,131
02 2.3132: Recharge batteries on during off-peak demand periods $2,568 - - $2,568
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $226 - $226
3,972
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,450 $2,555 $3,450
60,528
kWh
- -
TOTAL RECOMMENDED $10,375 $8,310 $3,676
64,500
kWh
$2,568
-
kW-mo/yr
$4,131
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs