Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aluminum foundries
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0979 #12 Y:2017 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $180,631 $300,000
UD0979 #11 Y:2017 Add area lighting switches $1,666 $130
UD0979 #10 Y:2017 Utilize higher efficiency lamps and/or ballasts $49,834 $68,160
UD0979 #09 Y:2017 Use optimum thickness insulation $18,548 $984
UD0979 #08 Y:2017 Use waste heat from hot flue gases to preheat $15,917 $12,782
UD0979 #07 Y:2017 Upgrade controls on compressors $13,560 $30,000
UD0979 #06 Y:2017 Eliminate or reduce compressed air usage $14,206 $905
UD0979 #05 Y:2017 Reduce the pressure of compressed air to the minimum required $31,331 $6
UD0979 #04 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $33,299 $1,000
UD0979 #03 Y:2017 Meter recycled water (to reduce sewer charges) $26,438 $4,500
UD0979 #02 Y:2017 Use optimum size and capacity equipment $7,096 -
UD0979 #01 Y:2017 Utilize energy-efficient belts and other improved mechanisms $14,640 -
UD0696 #12 Y:2004 Reduce ventilation air $1,416 -
UD0696 #11 Y:2004 Utilize higher efficiency lamps and/or ballasts $631 $486
UD0696 #10 Y:2004 Keep doors and windows shut when not on use $845 -
UD0696 #09 Y:2004 Disconnect ballasts $1,218 $53
UD0696 #08 Y:2004 Improve combustion control capability $1,617 -
UD0696 #07 Y:2004 Reduce the pressure of compressed air to the minimum required $1,891 $600
UD0696 #06 Y:2004 Purchase new equipment to reduce material use / cost $6,615 $13,230
UD0696 #05 Y:2004 Use waste heat from hot flue gases to preheat $9,026 $2,405