*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Cast and Machined Aluminum Components
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 65,000
ft2
Annual Production 75,000
units
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,980 581,422
kWh
Electricity Demand $69,654 2,923
kW-mo/yr
Natural Gas $70,349 3,027
MMBtu
TOTAL YEARLY COSTS $313,983
RECOMMENDED SAVINGS* $32,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $14,993 - $12,562
42,015
kWh
$2,431
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,160 - $2,911
9,734
kWh
$249
-
kW-mo/yr
-
03 2.2211: Use optimum temperature $1,605 - $1,021
2,623
kWh
$584
-
kW-mo/yr
-
04 2.3141: Use battery storage for demand control $8,817 - - $8,817
-
kW-mo/yr
-
05 2.6212: Turn off equipment during breaks, reduce operating time $1,244 - $1,244
4,160
kWh
- -
06 2.2511: Insulate bare equipment $109 $183 - - $109
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,472 $13,610 $2,010
6,722
kWh
$462
-
kW-mo/yr
-
TOTAL RECOMMENDED $32,400 $13,793 $19,748
65,254
kWh
$12,543
-
kW-mo/yr
$109
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs