42
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0810 #03 Y:2025 | 03 | 2025 | Use solar heat to make electricty | $82,382 | $1,300,527 | |
| OR0810 #02 Y:2025 | 02 | 2025 | Eliminate or reduce compressed air usage | $1,702 | $1,080 | |
| OR0810 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,031 | $626 | |
| OR0671 #05 Y:2016 | 05 | 2016 | Reduce combustion air flow to optimum | $2,295 | $1,000 | |
| OR0671 #04 Y:2016 | 04 | 2016 | Redesign process | $4,005 | $3,500 | |
| OR0671 #03 Y:2016 | 03 | 2016 | Convert to high volume low pressure (hvlp) paint guns | $24,528 | $1,495 | |
| OR0671 #02 Y:2016 | 02 | 2016 | Convert from batch operation to continuous processing | $190,362 | $300,000 | |
| OR0671 #01 Y:2016 | 01 | 2016 | Eliminate/reduce an operation | $357,967 | $669,217 | |
| OR0578 #06 Y:2011 | 06 | 2011 | Use most efficient type of electric motors | $26,958 | $97,580 | |
| OR0578 #05 Y:2011 | 05 | 2011 | Insulate glazing, walls, ceilings, and roofs | $10,360 | $13,329 | |
| OR0578 #04 Y:2011 | 04 | 2011 | Use photocell controls | $28,921 | $21,150 | |
| OR0578 #03 Y:2011 | 03 | 2011 | Install timers and/or thermostats | $10,803 | $3,800 | |
| OR0578 #02 Y:2011 | 02 | 2011 | Combine utility meters | $30,616 | - | |
| OR0578 #01 Y:2011 | 01 | 2011 | Re-use or recycle hot or cold process exhaust air | $3,007 | $5,720 | |
| OR0355 #08 Y:1999 | 08 | 1999 | Use closed cycle process to minimize waste water production | $7,780 | $2,016 | |
| OR0355 #07 Y:1999 | 07 | 1999 | Recover and reuse waste material | $9,531 | $3,000 | |
| OR0355 #06 Y:1999 | 06 | 1999 | Move product using mechanical means | $5,926 | $7,000 | |
| OR0355 #05 Y:1999 | 05 | 1999 | Install equipment to move product | $20,080 | $32,300 | |
| OR0355 #04 Y:1999 | 04 | 1999 | Increase use of automation | $30,485 | $15,439 | |
| OR0355 #03 Y:1999 | 03 | 1999 | Increase use of automation | $55,130 | $144,750 |