Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Nonferrous foundries (castings)
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0810 #03 Y:2025 Use solar heat to make electricty $82,382 $1,300,527
OR0810 #02 Y:2025 Eliminate or reduce compressed air usage $1,702 $1,080
OR0810 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $1,031 $626
OR0671 #05 Y:2016 Reduce combustion air flow to optimum $2,295 $1,000
OR0671 #04 Y:2016 Redesign process $4,005 $3,500
OR0671 #03 Y:2016 Convert to high volume low pressure (hvlp) paint guns $24,528 $1,495
OR0671 #02 Y:2016 Convert from batch operation to continuous processing $190,362 $300,000
OR0671 #01 Y:2016 Eliminate/reduce an operation $357,967 $669,217
OR0578 #06 Y:2011 Use most efficient type of electric motors $26,958 $97,580
OR0578 #05 Y:2011 Insulate glazing, walls, ceilings, and roofs $10,360 $13,329
OR0578 #04 Y:2011 Use photocell controls $28,921 $21,150
OR0578 #03 Y:2011 Install timers and/or thermostats $10,803 $3,800
OR0578 #02 Y:2011 Combine utility meters $30,616 -
OR0578 #01 Y:2011 Re-use or recycle hot or cold process exhaust air $3,007 $5,720
OR0355 #08 Y:1999 Use closed cycle process to minimize waste water production $7,780 $2,016
OR0355 #07 Y:1999 Recover and reuse waste material $9,531 $3,000
OR0355 #06 Y:1999 Move product using mechanical means $5,926 $7,000
OR0355 #05 Y:1999 Install equipment to move product $20,080 $32,300
OR0355 #04 Y:1999 Increase use of automation $30,485 $15,439
OR0355 #03 Y:1999 Increase use of automation $55,130 $144,750