ITAC Assessment: OR0355
ITAC logo
ITAC Assessment: OR0355
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Nonferrous machine parts
NAICS
n/a
SIC 3369: Nonferrous Foundries, Except Aluminum and Copper
Sales Range $100
M
to 500
M
# of Employees 489
Plant Area 173,000
ft2
Annual Production 1,579,000
lb
Production Hrs. Annual 7,680
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $725,344 22,253,224
kWh
Electricity Demand $278,486 939,492
kW-mo/yr
Electricity Fees $9,671 -
Natural Gas $576,128 155,045
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $178,526 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,594

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.4224: Upgrade controls on compressors $44,724 - $27,866
783,705
kWh
$16,858
-
kW-mo/yr
- - - - - - -
02 2.4239: Eliminate or reduce compressed air usage $4,870 - $4,750
133,646
kWh
$120
-
kW-mo/yr
- - - - - - -
03 3.2176: Increase use of automation $55,130 $144,750 - - - - - $57,730 - $(-2,600.0) -
04 3.2176: Increase use of automation $30,485 $15,439 - - - - - $30,485 - - -
05 4.445: Install equipment to move product $20,080 $32,300 - - - - - $2,840 $17,240 - -
06 4.423: Move product using mechanical means $5,926 $7,000 $(-14.0)
(-293)
kWh
- - - - $5,940 - - -
07 3.5311: Recover and reuse waste material $9,531 $3,000 - - - $3,726
-
lb
$4,805
-
lb
- - - $1,000
08 3.4111: Use closed cycle process to minimize waste water production $7,780 $2,016 $(-45.0)
(-1,172)
kWh
$(-30.0)
-
kW-mo/yr
$7,855
-
Tgal
- - - - - -
TOTAL RECOMMENDED $178,526 $204,505 $32,557
915,886
kWh
$16,948
-
kW-mo/yr
$7,855
-
Tgal
$3,726
-
lb
$4,805
-
lb
$96,995 $17,240 $(-2,600.0) $1,000
TOTAL IMPLEMENTED $49,594 - $32,616
917,351
kWh
$16,978
-
kW-mo/yr
- - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs