Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Hot Isostatic Material Pressing.
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 39
Plant Area 13,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 6,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,560 1,344,505
kWh
Electricity Demand $404,377 11,088
kW-mo/yr
Electricity Fees $26,659 -
Waste Disposal Costs
Other Liquid (non-haz) $498,543 1,147,500
gal
TOTAL YEARLY COSTS $1,057,139
RECOMMENDED SAVINGS* $160,829 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $160,829

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings
01 2.9114: Use solar heat to make electricty $55,294 $90,412 $21,683
228,480
kWh
$33,611
-
kW-mo/yr
-
02 2.3141: Use battery storage for demand control $15,758 - $(-2,732.0)
(-28,793)
kWh
$18,490
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $9,572 $31,410 $4,517
47,597
kWh
$5,055
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,271 $4,317 $781
8,226
kWh
$490
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,109 $18,901 $1,170
12,327
kWh
$2,939
-
kW-mo/yr
-
06 2.7232: Replace existing hvac unit with high efficiency model $5,370 $18,675 $684
7,209
kWh
$4,686
-
kW-mo/yr
-
07 3.5311: Recover and reuse waste material $69,455 $136,016 $(-10,454.0)
(-110,160)
kWh
$(-19,694.0)
-
kW-mo/yr
$99,603
-
gal
TOTAL RECOMMENDED $160,829 $299,731 $15,649
164,886
kWh
$45,577
-
kW-mo/yr
$99,603
-
gal
TOTAL IMPLEMENTED $160,829 $299,731 $15,649
164,886
kWh
$45,577
-
kW-mo/yr
$99,603
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs