ITAC Assessment: AM0141
ITAC logo
ITAC Assessment: AM0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product TACOS,TAQUITOS,BURRITOS
NAICS
n/a
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area
n/a
Annual Production 26,000,000
lb
Production Hrs. Annual 4,080
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $661,720 11,453,400
kWh
Natural Gas $146,485 70,401
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,863 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,033

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2121: Increase amount of condensate returned $13,280 $6,775 - $4,630
-
MMBtu
$8,650
02 2.2511: Insulate bare equipment $7,250 $1,670 $7,250
135,698
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,150 $11,940 $5,150
100,234
kWh
- -
04 2.4239: Eliminate or reduce compressed air usage $4,970 $500 $4,970
114,009
kWh
- -
05 2.6232: Install set-back timers $4,360 $200 $4,360
99,941
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,370 $325 $3,370
77,374
kWh
- -
07 2.4133: Use most efficient type of electric motors $2,433 $3,150 $2,433
44,842
kWh
- -
08 2.2414: Use waste heat from hot flue gases to preheat $1,820 $3,500 - $1,820
-
MMBtu
-
09 2.2531: Re-size charging openings or add movable cover or door $730 $4,800 - $730
-
MMBtu
-
10 2.6232: Install set-back timers $500 $400 $500
11,723
kWh
- -
TOTAL RECOMMENDED $43,863 $33,260 $28,033
583,821
kWh
$7,180
-
MMBtu
$8,650
TOTAL IMPLEMENTED $32,033 $17,220 $18,023
371,923
kWh
$5,360
-
MMBtu
$8,650
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs