ITAC Assessment: OR0671
ITAC logo
ITAC Assessment: OR0671
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Aerospace Parts
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3363: Aluminum Die-Castings
Sales Range $100
M
to 500
M
# of Employees 288
Plant Area 162,437
ft2
Annual Production 50,000
units
Production Hrs. Annual 5,850
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,543 3,611,700
kWh
Electricity Demand $52,957 9,379
kW-mo/yr
Electricity Fees $21,623 -
Natural Gas $66,479 7,411
MMBtu
TOTAL YEARLY COSTS $359,602
RECOMMENDED SAVINGS* $579,157 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,295

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Primary Raw Material Savings By-product Production Savings Increase in Production Savings
01 3.1161: Eliminate/reduce an operation $357,967 $669,217 $3,767
-
MMBtu
- $(-1,000.0) $355,200
02 3.1193: Convert from batch operation to continuous processing $190,362 $300,000 - - - $190,362
03 3.2123: Convert to high volume low pressure (hvlp) paint guns $24,528 $1,495 - $24,528 - -
04 2.5194: Redesign process $4,005 $3,500 $4,005
-
MMBtu
- - -
05 2.1113: Reduce combustion air flow to optimum $2,295 $1,000 $2,295
-
MMBtu
- - -
TOTAL RECOMMENDED $579,157 $975,212 $10,067
-
MMBtu
$24,528 $(-1,000.0) $545,562
TOTAL IMPLEMENTED $2,295 $1,000 $2,295
-
MMBtu
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs