Assessment Year | 1999 |
---|---|
Principal Product | Aluminum Wheels |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 285 |
Plant Area |
160,000
ft2
|
Annual Production | 1,200,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $666,620 | 19,050,411 |
kWh
|
$0.035 |
Electricity Demand | $292,345 | 34,008 |
kW-mo/yr
|
$8.60 |
Electricity Fees | $15,168 | - |
|
- |
Natural Gas | $311,615 | 67,000 |
MMBtu
|
$4.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $359,650 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $79,062 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.5311: Recover and reuse waste material | $222,220 | $77,760 | - | - | - |
$(-2,000,000.0)
-
lb
|
- | $2,222,220 | - | |
02 | 2.7243: Improve air circulation with destratification fans / other methods | $52,782 | $80,100 |
$52,782
8,352,872
kWh
|
- | - | - | - | - | - | |
03 | 3.4155: Meter waste water | $26,280 | $2,980 | - | - |
$26,280
-
Tgal
|
- | - | - | - | |
04 | 4.432: Cross-train personnel to avoid lost time | $22,500 | $25,000 | - | - | - | - | $22,500 | - | - | |
05 | 3.4114: Replace city water with recycled water via cooling tower | $20,700 | $21,780 | - | - |
$10,350
-
Tgal
|
- | - | - |
$10,350
-
Tgal
|
|
06 | 2.3212: Optimize plant power factor | $15,168 | $29,100 | - | $15,168 | - | - | - | - | - | |
TOTAL RECOMMENDED | $359,650 | $236,720 |
$52,782
8,352,872
kWh
|
$15,168 |
$36,630
-
Tgal
|
$(-2,000,000.0)
-
lb
|
$22,500 | $2,222,220 |
$10,350
-
Tgal
|
||
TOTAL IMPLEMENTED | $79,062 | $83,080 |
$52,782
8,352,872
kWh
|
- |
$26,280
-
Tgal
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs