ITAC Assessment: ME0219
ITAC logo
ITAC Assessment: ME0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Custom Wood Turning
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 70,800
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 2,400
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,407 1,366,061
kWh
Electricity Demand $34,609 5,001
kW-mo/yr
Electricity Fees $4,375 -
Fuel Oil #1 $2,306 341
MMBtu
Fuel Oil #2 $6,961 1,252
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,461 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,712

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Other Liquid (non-haz) Savings Administrative Changes Savings By-product Production Savings
01 2.8121: Apply for tax-free status for energy purchases $2,370 - - - - - $2,370 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,367 $7,625 $1,570
22,567
kWh
$797
-
kW-mo/yr
- - - -
03 2.2511: Insulate bare equipment $981 $1,602 - - $981
-
MMBtu
- - -
04 2.8121: Apply for tax-free status for energy purchases $452 - - - - - $452 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $420 $300 $420
7,034
kWh
- - - - -
06 2.4221: Install compressor air intakes in coolest locations $401 $250 $401
6,741
kWh
- - - - -
07 2.8121: Apply for tax-free status for energy purchases $150 - - - - - $150 -
08 2.8123: Pay utility bills on time $119 - - - - - $119 -
09 3.1191: Change procedures / equipment / operating conditions $59,587 $43,304 - - - - - $59,587
10 3.7214: Reduce or eliminate waste $1,614 $50 - - - $1,614
-
gal
- -
TOTAL RECOMMENDED $68,461 $53,131 $2,391
36,342
kWh
$797
-
kW-mo/yr
$981
-
MMBtu
$1,614
-
gal
$3,091 $59,587
TOTAL IMPLEMENTED $64,712 $43,654 $420
7,034
kWh
- - $1,614
-
gal
$3,091 $59,587
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Other Liquid (non-haz) Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs