Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

438

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Secondary smelting and refining of nonferrous metals
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0584 #06 Y:2022 Use solar heat to make electricty $123,728 $381,839
SF0584 #05 Y:2022 Eliminate or reduce compressed air usage $6,260 $23,959
SF0584 #04 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $8,188 $24,576
SF0584 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $8,882 $13,939
SF0584 #02 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $5,093 $4,749
SF0584 #01 Y:2022 Reduce space conditioning during non-working hours $9,346 $2,177
TT0242 #06 Y:2020 Install timers and/or thermostats $1,854 $1,700
TT0242 #05 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $4,251 $263
TT0242 #04 Y:2020 Meter recycled water (to reduce sewer charges) $13,945 $1,900
TT0242 #03 Y:2020 Utilize higher efficiency lamps and/or ballasts $24,394 $110,050
TT0242 #02 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $31,412 $62,026
TT0242 #01 Y:2020 Change procedures / equipment / operating conditions $1,906,442 $4,500,000
UA0209 #05 Y:2019 Size electric motors for peak operating efficiency $1,176 $1,200
UA0209 #04 Y:2019 Reduce the pressure of compressed air to the minimum required $72,891 $2,850
UA0209 #03 Y:2019 Reduce the pressure of compressed air to the minimum required $36,956 $100
UA0209 #02 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $17,697 $3,007
UA0209 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $5,815 $10,528
CO0725 #06 Y:2016 Utilize energy-efficient belts and other improved mechanisms $3,050 $2,950
CO0725 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $4,040 $13,050
CO0725 #04 Y:2016 Use filter and drying oven to reduce sludge volume $5,930 $24,000