438
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Secondary smelting and refining of nonferrous metals | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SF0584 #06 Y:2022 | 06 | 2022 | Use solar heat to make electricty | $123,728 | $381,839 | |
SF0584 #05 Y:2022 | 05 | 2022 | Eliminate or reduce compressed air usage | $6,260 | $23,959 | |
SF0584 #04 Y:2022 | 04 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $8,188 | $24,576 | |
SF0584 #03 Y:2022 | 03 | 2022 | Utilize higher efficiency lamps and/or ballasts | $8,882 | $13,939 | |
SF0584 #02 Y:2022 | 02 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $5,093 | $4,749 | |
SF0584 #01 Y:2022 | 01 | 2022 | Reduce space conditioning during non-working hours | $9,346 | $2,177 | |
TT0242 #06 Y:2020 | 06 | 2020 | Install timers and/or thermostats | $1,854 | $1,700 | |
TT0242 #05 Y:2020 | 05 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,251 | $263 | |
TT0242 #04 Y:2020 | 04 | 2020 | Meter recycled water (to reduce sewer charges) | $13,945 | $1,900 | |
TT0242 #03 Y:2020 | 03 | 2020 | Utilize higher efficiency lamps and/or ballasts | $24,394 | $110,050 | |
TT0242 #02 Y:2020 | 02 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $31,412 | $62,026 | |
TT0242 #01 Y:2020 | 01 | 2020 | Change procedures / equipment / operating conditions | $1,906,442 | $4,500,000 | |
UA0209 #05 Y:2019 | 05 | 2019 | Size electric motors for peak operating efficiency | $1,176 | $1,200 | |
UA0209 #04 Y:2019 | 04 | 2019 | Reduce the pressure of compressed air to the minimum required | $72,891 | $2,850 | |
UA0209 #03 Y:2019 | 03 | 2019 | Reduce the pressure of compressed air to the minimum required | $36,956 | $100 | |
UA0209 #02 Y:2019 | 02 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $17,697 | $3,007 | |
UA0209 #01 Y:2019 | 01 | 2019 | Utilize higher efficiency lamps and/or ballasts | $5,815 | $10,528 | |
CO0725 #06 Y:2016 | 06 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $3,050 | $2,950 |
n/a
|
CO0725 #05 Y:2016 | 05 | 2016 | Utilize higher efficiency lamps and/or ballasts | $4,040 | $13,050 |
n/a
|
CO0725 #04 Y:2016 | 04 | 2016 | Use filter and drying oven to reduce sludge volume | $5,930 | $24,000 |
n/a
|