*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Secondary Nonferrous Metals
NAICS 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 70,000
ft2
Annual Production 4,000
ton
Production Hrs. Annual 4,176
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,383 506,430
kWh
Electricity Demand $42,282 2,932
kW-mo/yr
Natural Gas $200,487 18,175
MMBtu
TOTAL YEARLY COSTS $348,152
RECOMMENDED SAVINGS* $161,497 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,228

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $9,346 $2,177 $3,311
11,767
kWh
- $6,035
-
MMBtu
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,093 $4,749 $4,045
14,376
kWh
$1,048
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,882 $13,939 $6,447
22,909
kWh
$2,116
-
kW-mo/yr
- $402 $(-83.0)
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,188 $24,576 $8,188
28,914
kWh
- - - -
05 2.4239: Eliminate or reduce compressed air usage $6,260 $23,959 $6,260
22,245
kWh
- - - -
06 2.9114: Use solar heat to make electricty $123,728 $381,839 $123,728
439,687
kWh
- - - -
TOTAL RECOMMENDED $161,497 $451,239 $151,979
539,898
kWh
$3,164
-
kW-mo/yr
$6,035
-
MMBtu
$402 $(-83.0)
TOTAL IMPLEMENTED $18,228 $16,116 $9,758
34,676
kWh
$2,116
-
kW-mo/yr
$6,035
-
MMBtu
$402 $(-83.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs