| Assessment Year | 2022 |
|---|---|
| Principal Product | Secondary Nonferrous Metals |
| NAICS | 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum) |
| SIC | 3341: Secondary Smelting and Refining of Nonferrous Metals |
| Sales Range | $10 M to 50M |
| # of Employees | 30 |
| Plant Area |
70,000
ft2
|
| Annual Production | 4,000
ton
|
| Production Hrs. Annual | 4,176
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $105,383 | 506,430 |
kWh
|
$0.21 |
| Electricity Demand | $42,282 | 2,932 |
kW-mo/yr
|
$14.42 |
| Natural Gas | $200,487 | 18,175 |
MMBtu
|
$11.03 |
| TOTAL YEARLY COSTS | $348,152 | |||
| RECOMMENDED SAVINGS* | $161,497 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,228 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $9,346 | $2,177 |
$3,311
11,767
kWh
|
- |
$6,035
-
MMBtu
|
- | - | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,093 | $4,749 |
$4,045
14,376
kWh
|
$1,048
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,882 | $13,939 |
$6,447
22,909
kWh
|
$2,116
-
kW-mo/yr
|
- | $402 | $(-83.0) | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,188 | $24,576 |
$8,188
28,914
kWh
|
- | - | - | - | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $6,260 | $23,959 |
$6,260
22,245
kWh
|
- | - | - | - | |
| 06 | 2.9114: Use solar heat to make electricty | $123,728 | $381,839 |
$123,728
439,687
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $161,497 | $451,239 |
$151,979
539,898
kWh
|
$3,164
-
kW-mo/yr
|
$6,035
-
MMBtu
|
$402 | $(-83.0) | ||
| TOTAL IMPLEMENTED | $18,228 | $16,116 |
$9,758
34,676
kWh
|
$2,116
-
kW-mo/yr
|
$6,035
-
MMBtu
|
$402 | $(-83.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs