Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Steel foundries, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0331 #05 Y:1998 Optimize plant power factor - $136,000
OR0331 #04 Y:1998 Convert combustion equipment to burn natural gas $14,990 $79,750
OR0331 #03 Y:1998 Recover waste heat from equipment $78,861 $26,602
OR0331 #02 Y:1998 Eliminate leaks in inert gas and compressed air lines/ valves $4,781 $1,000
OR0331 #01 Y:1998 Add equipment/ operators to reduce production bottleneck $1,374,400 $105,000
OR0244 #04 Y:1995 Insulate bare equipment $14,400 $5,385
OR0244 #03 Y:1995 Use most efficient type of electric motors $700 $1,195
OR0244 #02 Y:1995 Upgrade controls on compressors $1,725 $200
OR0244 #01 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $17,764 $14,938
OR0162 #07 Y:1992 Redesign process $15,590 $130,000
OR0162 #06 Y:1992 Use or replace with energy efficient substitutes $26,207 $150,000
OR0162 #05 Y:1992 Use waste heat from hot flue gases to generate steam $4,388 $14,272
OR0162 #04 Y:1992 Use most efficient type of electric motors $1,666 $5,359
OR0162 #03 Y:1992 Use demand controller or load shedder $524 $750
OR0162 #02 Y:1992 Turn off equipment when not in use $5,784 $2,920
OR0162 #01 Y:1992 Utilize energy-efficient belts and other improved mechanisms $289 -
OR0120 #05 Y:1991 Insulate bare equipment $50 $1,095
OR0120 #04 Y:1991 Use most efficient type of electric motors $113 $226
OR0120 #03 Y:1991 Optimize plant power factor $1,000 $1,425
OR0120 #02 Y:1991 Eliminate leaks in inert gas and compressed air lines/ valves $2,938 $3,000