26
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Steel pipe and tubes | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1065 #08 Y:2023 | 08 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $3,334 | $3,051 | |
| UD1065 #07 Y:2023 | 07 | 2023 | Eliminate or reduce compressed air usage | $6,980 | $2,457 | |
| UD1065 #06 Y:2023 | 06 | 2023 | Replace hydraulic / pneumatic equipment with electric equipment | $210 | $741 | |
| UD1065 #05 Y:2023 | 05 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,046 | $952 | |
| UD1065 #04 Y:2023 | 04 | 2023 | Install occupancy sensors | $19,345 | $19,667 | |
| UD1065 #03 Y:2023 | 03 | 2023 | Reduce illumination to minimum necessary levels | $38,039 | - | |
| UD1065 #02 Y:2023 | 02 | 2023 | Meter recycled water (to reduce sewer charges) | $12,692 | $430 | |
| UD1065 #01 Y:2023 | 01 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $589 | - | |
| UD0990 #06 Y:2018 | 06 | 2018 | Utilize higher efficiency lamps and/or ballasts | $41,379 | $200,263 | |
| UD0990 #05 Y:2018 | 05 | 2018 | Develop a repair/replace policy | $2,774 | $10,470 | |
| UD0990 #04 Y:2018 | 04 | 2018 | Meter recycled water (to reduce sewer charges) | $7,458 | $400 | |
| UD0990 #03 Y:2018 | 03 | 2018 | Optimize plant power factor | $72,351 | $48,000 | |
| UD0990 #02 Y:2018 | 02 | 2018 | Eliminate leaks in inert gas and compressed air lines/ valves | $574 | $1,000 | |
| UD0990 #01 Y:2018 | 01 | 2018 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,680 | $4,200 | |
| UD0489 #06 Y:1996 | 06 | 1996 | Replace electrically-operated equipment with fossil fuel equipment | $1,457 | $1,000 | |
| UD0489 #05 Y:1996 | 05 | 1996 | Meter recycled water (to reduce sewer charges) | $1,008 | $400 | |
| UD0489 #04 Y:1996 | 04 | 1996 | Reschedule plant operations or reduce load to avoid peaks | $488 | $100 | |
| UD0489 #03 Y:1996 | 03 | 1996 | Utilize higher efficiency lamps and/or ballasts | $4,445 | $10,800 | |
| UD0489 #02 Y:1996 | 02 | 1996 | Use / purchase optimum sized compressor | $11,117 | $15,000 | |
| UD0489 #01 Y:1996 | 01 | 1996 | Optimize plant power factor | $2,203 | $3,000 |