Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Metal Tubing
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 170,000
ft2
Annual Production 3,200
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $409,717 4,341,600
kWh
Electricity Demand $86,844 10,904
kW-mo/yr
LPG $1,115 36
MMBtu
Waste Disposal Costs
Water Usage $9,950 1,786
Tgal
Water Disposal $2,895 1,666
Tgal
TOTAL YEARLY COSTS $510,520
RECOMMENDED SAVINGS* $73,965 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4131: Size electric motors for peak operating efficiency $54,602 - $43,912
465,317
kWh
$10,690
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,106 $26,500 $16,106
170,668
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $3,257 $9,840 $2,619
27,756
kWh
$638
-
kW-mo/yr
TOTAL RECOMMENDED $73,965 $36,340 $62,637
663,740
kWh
$11,328
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs