Assessment Year | 2023 |
---|---|
Principal Product | Steel Tubing |
NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
198,000
ft2
|
Annual Production | 200,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $310,069 | 5,350,294 |
kWh
|
$0.058 | |
Electricity Demand | $164,941 | 11,337 |
kW-mo/yr
|
$14.55 | |
Electricity Fees | $78,067 | - |
|
- | |
Natural Gas | $657,950 | 86,619 |
MMBtu
|
$7.60 | |
Waste Disposal Costs | |||||
Water Usage | $117,000 | 11,444 |
Tgal
|
$10.22 | |
TOTAL YEARLY COSTS | $1,328,027 | ||||
RECOMMENDED SAVINGS* | $34,265 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $17,580 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $14,680 | $41,043 | - |
$14,680
-
kW-mo/yr
|
- | |
02 | 2.7444: Close holes and openings in building such as broken windows | $7,068 | $1,938 | - | - |
$7,068
-
MMBtu
|
|
03 | 2.7444: Close holes and openings in building such as broken windows | $5,776 | $3,225 | - | - |
$5,776
-
MMBtu
|
|
04 | 2.4239: Eliminate or reduce compressed air usage | $3,841 | $1,700 |
$2,590
44,650
kWh
|
$1,251
-
kW-mo/yr
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,789 | $1,875 |
$1,207
20,805
kWh
|
$582
-
kW-mo/yr
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,111 | $870 |
$810
13,965
kWh
|
$301
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $34,265 | $50,651 |
$4,607
79,420
kWh
|
$16,814
-
kW-mo/yr
|
$12,844
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,580 | $43,788 |
$2,017
34,770
kWh
|
$15,563
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs