ITAC Assessment: UD1065
ITAC logo
ITAC Assessment: UD1065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Steel Pipe and Tubes
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317: Steel Pipe and Tubes
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 425,000
ft2
Annual Production 54,013,022
lb
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $383,160 7,255,710
kWh
Electricity Demand $475,730 31,401
kW-mo/yr
Electricity Fees $780 -
Natural Gas $115,057 19,525
MMBtu
Waste Disposal Costs
Water Usage $20,944 2,043
Tgal
Water Disposal $18,274 2,043
Tgal
TOTAL YEARLY COSTS $1,013,945
RECOMMENDED SAVINGS* $83,235 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,026

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $589 - $272
5,159
kWh
$317
-
kW-mo/yr
- - -
02 3.4116: Meter recycled water (to reduce sewer charges) $12,692 $430 - - $12,692
-
Tgal
- -
03 2.7111: Reduce illumination to minimum necessary levels $38,039 - $24,513
464,256
kWh
$13,526
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $19,345 $19,667 $7,117
134,784
kWh
$11,781
-
kW-mo/yr
- $6 $441
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,046 $952 $800
15,144
kWh
$1,246
-
kW-mo/yr
- - -
06 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $210 $741 $210
3,974
kWh
- - - -
07 2.4239: Eliminate or reduce compressed air usage $6,980 $2,457 $6,980
132,198
kWh
- - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,334 $3,051 $3,334
63,141
kWh
- - - -
TOTAL RECOMMENDED $83,235 $27,298 $43,226
818,656
kWh
$26,870
-
kW-mo/yr
$12,692
-
Tgal
$6 $441
TOTAL IMPLEMENTED $9,026 $3,409 $7,780
147,342
kWh
$1,246
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs