ITAC Assessment: LT8392
ITAC logo
ITAC Assessment: LT8392
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Butt-welding fitting
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 522,567
ft2
Annual Production 73,535,756
lb
Production Hrs. Annual 6,240
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,768 2,280,240
kWh
Electricity Demand $189,023 16,509
kW-mo/yr
Natural Gas $290,347 61,812
MMBtu
Other Gas $196,535 1
MMBtu
Waste Disposal Costs
Water Usage $15,189 2,173
Tgal
TOTAL YEARLY COSTS $922,863
RECOMMENDED SAVINGS* $12,689 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,294 $3,694 $3,741
36,821
kWh
$1,553
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $2,420 $2,019 $1,488
14,645
kWh
$967
-
kW-mo/yr
$(-35.4)
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,975 $1,150 $4,975
48,964
kWh
- -
TOTAL RECOMMENDED $12,689 $6,863 $10,204
100,430
kWh
$2,521
-
kW-mo/yr
$(-35.4)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs