ITAC Assessment: IC0112
ITAC logo
ITAC Assessment: IC0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product precipated silica
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 80,000
ft2
Annual Production 77,161,792
lb
Production Hrs. Annual 8,520
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $715,624 12,216,000
kWh
Natural Gas $2,217,117 344,493
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $533,760 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $162,118

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings Water Consumption Savings
01 2.1224: Replace boiler $300,562 $414,240 - $(-1,122,948.0)
-
MMBtu
$1,475,752 $(-52,242.0)
-
Tgal
02 2.2449: Recover heat from exhausted steam, hot air or hot water $57,168 $11,016 - - $57,168 -
03 2.5111: Convert from indirect to direct fired systems $44,296 $145,126 - $(-49,627.0)
-
MMBtu
$93,923 -
04 2.4133: Use most efficient type of electric motors $42,495 $66,129 $42,495
720,258
kWh
- - -
05 2.7273: Install desiccant humidity control system $28,585 $165,480 $(-15,857.0)
(-268,777)
kWh
$44,442
-
MMBtu
- -
06 2.4133: Use most efficient type of electric motors $48,787 $157,465 $48,787
827,135
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,753 $2,300 $8,753
148,356
kWh
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $3,114 - $3,114
52,778
kWh
- - -
TOTAL RECOMMENDED $533,760 $961,756 $87,292
1,479,750
kWh
$(-1,128,133.0)
-
MMBtu
$1,626,843 $(-52,242.0)
-
Tgal
TOTAL IMPLEMENTED $162,118 $315,907 $60,654
1,028,269
kWh
$(-49,627.0)
-
MMBtu
$151,091 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs