ITAC Assessment: NC0634
ITAC logo
ITAC Assessment: NC0634
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Upholstered furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 220,000
ft2
Annual Production 175,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,392 1,504,477
kWh
Electricity Demand $25,980 5,811
kW-mo/yr
Natural Gas $31,343 4,602
MMBtu
TOTAL YEARLY COSTS $154,715
RECOMMENDED SAVINGS* $19,737 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,445

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,879 $25,678 $11,637
179,035
kWh
$2,242
-
kW-mo/yr
02 2.6218: Turn off equipment when not in use $546 $2,500 $388
5,968
kWh
$158
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,566 $850 $4,017
61,802
kWh
$549
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $746 $120 $656
10,094
kWh
$90
-
kW-mo/yr
TOTAL RECOMMENDED $19,737 $29,148 $16,698
256,899
kWh
$3,039
-
kW-mo/yr
TOTAL IMPLEMENTED $18,445 $26,528 $15,654
240,837
kWh
$2,791
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs