Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,145

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Steel works, blast furnaces, and rolling and finishing mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0283 #01 Y:2008 Repair furnaces and oven doors so that they seal efficiently $48,061 $100,000
UF0417 #11 Y:2008 Meter recycled water (to reduce sewer charges) $2,200 $4,158
UF0417 #10 Y:2008 Meter recycled water (to reduce sewer charges) $45,096 $15,000
UF0417 #09 Y:2008 Improve air circulation with destratification fans / other methods $65,568 $31,410
UF0417 #08 Y:2008 Repair faulty insulation in furnaces, boilers, etc $3,201 $1,200
UF0417 #07 Y:2008 Use most efficient type of electric motors $19,601 $64,339
UF0417 #06 Y:2008 Install common header on compressors $12,647 $900
UF0417 #05 Y:2008 Install common header on compressors $14,617 -
UF0417 #04 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $8,992 -
UF0417 #03 Y:2008 Turn off equipment during breaks, reduce operating time $10,710 -
UF0417 #02 Y:2008 Utilize daylight whenever possible in lieu of artificial light $2,012 -
UF0417 #01 Y:2008 Utilize higher efficiency lamps and/or ballasts $32,847 $36,441
OR0535 #05 Y:2008 Install occupancy sensors $2,286 $1,850
OR0535 #04 Y:2008 Use most efficient type of electric motors $7,829 $47,094
OR0535 #03 Y:2008 Upgrade controls on compressors $43,923 $7,200
OR0535 #02 Y:2008 Clean steam coils in processing tanks $6,588 $1,250
OR0535 #01 Y:2008 Size electric motors for peak operating efficiency $46,153 $56,500
UW0019 #04 Y:2008 Install occupancy sensors $4,446 $2,439
UW0019 #03 Y:2008 Insulate bare equipment $14,046 $2,908
UW0019 #02 Y:2008 Insulate bare equipment $15,042 $2,500