ITAC Assessment: UF0417
ITAC logo
ITAC Assessment: UF0417
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Prestressed Concrete Strand
NAICS 331222: Steel Wire Drawing
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $50
M
to 100
M
# of Employees 63
Plant Area 116,000
ft2
Annual Production 62,000
ton
Production Hrs. Annual 8,400
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,743,998 22,464,000
kWh
Natural Gas $133,156 149,730
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $217,491 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,714

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $32,847 $36,441 $32,847
434,066
kWh
- -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,012 - $2,012
28,739
kWh
- -
03 2.6212: Turn off equipment during breaks, reduce operating time $10,710 - $10,710
153,007
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,992 - $8,992
11,530
kWh
- -
05 2.4225: Install common header on compressors $14,617 - $14,617
188,101
kWh
- -
06 2.4225: Install common header on compressors $12,647 $900 $12,647
180,677
kWh
- -
07 2.4133: Use most efficient type of electric motors $19,601 $64,339 $19,601
251,159
kWh
- -
08 2.1131: Repair faulty insulation in furnaces, boilers, etc $3,201 $1,200 - $3,201
-
MMBtu
-
09 2.7243: Improve air circulation with destratification fans / other methods $65,568 $31,410 $65,568
773,149
kWh
- -
10 3.4116: Meter recycled water (to reduce sewer charges) $45,096 $15,000 - - $45,096
-
Tgal
11 3.4116: Meter recycled water (to reduce sewer charges) $2,200 $4,158 - - $2,200
-
Tgal
TOTAL RECOMMENDED $217,491 $153,448 $166,994
2,020,428
kWh
$3,201
-
MMBtu
$47,296
-
Tgal
TOTAL IMPLEMENTED $21,714 - $21,714
193,276
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs