ITAC Assessment: SU0128
ITAC logo
ITAC Assessment: SU0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Boat windshields
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 127
Plant Area 125,340
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $154,831 2,473,262
kWh
Electricity Demand $121,143 8,092
kW-mo/yr
Electricity Fees $17,858 -
Natural Gas $50,178 8,683
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,336 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,634

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $151 - $83
1,186
kWh
$68
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $573 - $573
8,182
kWh
- - -
03 4.821: Pay bills on time to avoid late fees $1,088 - - - $1,088 -
04 2.7243: Improve air circulation with destratification fans / other methods $1,141 $2,364 - - - $1,141
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,395 - $1,395
19,929
kWh
- - -
06 2.3212: Optimize plant power factor $1,486 $7,000 - - $1,486 -
07 2.2511: Insulate bare equipment $1,502 $1,100 - - - $1,502
-
MMBtu
TOTAL RECOMMENDED $7,336 $10,464 $2,051
29,297
kWh
$68
-
kW-mo/yr
$2,574 $2,643
-
MMBtu
TOTAL IMPLEMENTED $2,634 - $1,478
21,115
kWh
$68
-
kW-mo/yr
$1,088 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs