ITAC Assessment: OR0535
ITAC logo
ITAC Assessment: OR0535
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Large Diameter Pipe
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 300,000
ft2
Annual Production 1
units
Production Hrs. Annual 4,992
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $368,353 6,561,760
kWh
Electricity Demand $48,996 20,883
kW-mo/yr
Electricity Fees $46,308 -
Natural Gas $189,757 17,360
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,779 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4131: Size electric motors for peak operating efficiency $46,153 $56,500 $46,153
176,773
kWh
-
02 2.2151: Clean steam coils in processing tanks $6,588 $1,250 - $6,588
-
MMBtu
03 2.4224: Upgrade controls on compressors $43,923 $7,200 $43,923
863,036
kWh
-
04 2.4133: Use most efficient type of electric motors $7,829 $47,094 $7,829
102,474
kWh
-
05 2.7135: Install occupancy sensors $2,286 $1,850 $2,286
18,527
kWh
-
TOTAL RECOMMENDED $106,779 $113,894 $100,191
1,160,810
kWh
$6,588
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs