ITAC Assessment: TA0003
ITAC logo
ITAC Assessment: TA0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Business Forms
NAICS
n/a
SIC 2764:
Sales Range $10
M
to 50
M
# of Employees 99
Plant Area 104,850
ft2
Annual Production 3,400,000
lb
Production Hrs. Annual 6,048
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,781 2,455,500
kWh
Electricity Demand $48,289 5,953
kW-mo/yr
Natural Gas $1,881 298
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,446 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,397

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings
01 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $6,177 $2,016 - $6,177
-
kW-mo/yr
- -
02 3.6192: Use a less expensive method of waste removal $3,272 - - - $3,272
-
Tgal
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,184 $1,049 $1,466
56,380
kWh
$1,718
-
kW-mo/yr
- -
04 3.5316: Contract a wood pallet recycling company $3,110 - - - - $3,110
-
gal
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,912 $4,110 n/a $2,912
29,606
kWh
- - -
06 2.7492: Use proper thickness of insulation on building envelope $2,195 $12,855 $2,195
84,413
kWh
- - -
07 3.5248: Separate and recycle scrap metal to foundry or for sale $838 $624 - - $838
-
Tgal
-
08 2.7135: Install occupancy sensors $470 $175 $470
18,068
kWh
- - -
09 3.1191: Change procedures / equipment / operating conditions $288 - $288
3,902
kWh
- - -
TOTAL RECOMMENDED $22,446 $20,829 $7,331
192,369
kWh
$7,895
-
kW-mo/yr
$4,110
-
Tgal
$3,110
-
gal
TOTAL IMPLEMENTED $13,397 $2,640 - $6,177
-
kW-mo/yr
$4,110
-
Tgal
$3,110
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs