ITAC Assessment: CO0115
ITAC logo
ITAC Assessment: CO0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product GRANULATED SUGAR, FEED
NAICS
n/a
SIC 2063: Beet Sugar
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 90,000,000
lb
Production Hrs. Annual 3,600
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $269,904 6,563,892
kWh
Natural Gas $30,748 9,980
MMBtu
Coal $1,216,734 1,041,877
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $188,260 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,469

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Coal Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $34,100 $7,000 - $34,100
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $112,791 $80,000 - $112,791
-
MMBtu
03 3.1191: Change procedures / equipment / operating conditions $23,377 $5,000 - $23,377
-
MMBtu
04 2.2162: Reduce excess steam bleeding $3,914 $2,000 - $3,914
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $4,410 $10,670 - $4,410
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,111 - $2,892
70,340
kWh
$219
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,557 $38,200 $6,097
148,300
kWh
$460
-
MMBtu
TOTAL RECOMMENDED $188,260 $142,870 $8,989
218,640
kWh
$179,271
-
MMBtu
TOTAL IMPLEMENTED $75,469 $62,870 $8,989
218,640
kWh
$66,480
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Coal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs