Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Steel works, blast furnaces, and rolling and finishing mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0003 #08 Y:2022 Turn off equipment when not in use $326 -
MU0003 #07 Y:2022 Turn off equipment when not in use $104 -
MU0003 #06 Y:2022 Insulate glazing, walls, ceilings, and roofs $1,452 $1,180
MU0003 #05 Y:2022 Utilize higher efficiency lamps and/or ballasts $3,005 $4,005
MU0003 #04 Y:2022 Reduce illumination to minimum necessary levels $421 -
MU0003 #03 Y:2022 Pay bills on time to avoid late fees $2,120 -
MU0003 #02 Y:2022 Close holes and openings in building such as broken windows $1,354 $6,000
MU0003 #01 Y:2022 Utilize higher efficiency lamps and/or ballasts $152 $480
UMS010 #03 Y:2012 Recover and reuse cooling water $10,000 $20,000
UMS010 #02 Y:2012 Repair furnaces and oven doors so that they seal efficiently $16,000 $10,000
UMS010 #01 Y:2012 Use waste heat from hot flue gases to preheat $46,000 $85,000
UM0365 #08 Y:2010 Install storm windows and doors $819 -
UM0365 #07 Y:2010 Use optimum thickness insulation $1,040 $22,500
UM0365 #06 Y:2010 Install vinyl strip / high speed / air curtain doors $3,455 $3,500
UM0365 #05 Y:2010 Recover waste heat from equipment $43,773 $13,000
UM0365 #04 Y:2010 Install occupancy sensors $1,051 -
UM0365 #03 Y:2010 Install compressor air intakes in coolest locations $4,966 $13,000
UM0365 #02 Y:2010 Use optimum size and capacity equipment $15,991 $107,000
UM0365 #01 Y:2010 Utilize higher efficiency lamps and/or ballasts $22,536 $77,254
UM0194 #07 Y:2001 Optimize plant power factor $14,163 $22,163