| Assessment Year | 2010 |
|---|---|
| Principal Product | Drawn Steel |
| NAICS | 331222: Steel Wire Drawing |
| SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
| Sales Range | $50 M to 100M |
| # of Employees | 60 |
| Plant Area |
180,000
ft2
|
| Annual Production | 60,000
ton
|
| Production Hrs. Annual | 3,570
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $295,508 | 6,387,080 |
kWh
|
$0.046 |
| Electricity Demand | $352,421 | 22,402 |
kW-mo/yr
|
$15.73 |
| Natural Gas | $160,364 | 16,256 |
MMBtu
|
$9.86 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $93,631 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $92,812 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $22,536 | $77,254 |
$11,378
245,902
kWh
|
$11,158
-
kW-mo/yr
|
- | |
| 02 | 2.4323: Use optimum size and capacity equipment | $15,991 | $107,000 |
$15,991
345,600
kWh
|
- | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $4,966 | $13,000 |
$3,031
65,497
kWh
|
$1,935
-
kW-mo/yr
|
- | |
| 04 | 2.7135: Install occupancy sensors | $1,051 | - |
$1,051
22,708
kWh
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $43,773 | $13,000 | - | - |
$43,773
-
MMBtu
|
|
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,455 | $3,500 | - | - |
$3,455
-
MMBtu
|
|
| 07 | 2.2515: Use optimum thickness insulation | $1,040 | $22,500 | - | - |
$1,040
-
MMBtu
|
|
| 08 | 2.7494: Install storm windows and doors | $819 | - | - | - |
$819
-
MMBtu
|
|
| TOTAL RECOMMENDED | $93,631 | $236,254 |
$31,451
679,707
kWh
|
$13,093
-
kW-mo/yr
|
$49,087
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $92,812 | $236,254 |
$31,451
679,707
kWh
|
$13,093
-
kW-mo/yr
|
$48,268
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs