ITAC Assessment: LT0017
ITAC logo
ITAC Assessment: LT0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ELECTRIC STEAM IRONS
NAICS
n/a
SIC 3633: Household Laundry Equipment
Sales Range $10
M
to 50
M
# of Employees 488
Plant Area
n/a
Annual Production 2,300,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $477,292 7,777,550
kWh
Natural Gas $73,817 11,772
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,259 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,690

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
03 2.1233: Analyze flue gas for proper air/fuel ratio $4,540 $150 - $4,540
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,960 $13,000 - $1,960
-
MMBtu
05 2.1122: Re-size charging openings or add a movable door on equipment $569 $600 $425
8,792
kWh
$144
-
MMBtu
06 2.3191: Use demand controller or load shedder $6,190 $10,000 $6,190
-
kWh
-
TOTAL RECOMMENDED $13,259 $23,750 $6,615
8,792
kWh
$6,644
-
MMBtu
TOTAL IMPLEMENTED $12,690 $23,150 $6,190
-
kWh
$6,500
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs