ITAC Assessment: LE0512
ITAC logo
ITAC Assessment: LE0512
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Paper Packaging
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 160,000
ft2
Annual Production 148,000,000
pieces
Production Hrs. Annual 5,460
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $354,087 3,412,518
kWh
Electricity Demand $23,163 13,210
kW-mo/yr
Electricity Fees $137,787 -
Natural Gas $27,025 3,265
MMBtu
TOTAL YEARLY COSTS $542,062
RECOMMENDED SAVINGS* $469,283 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $468,197

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,383 $4,000 $3,262
31,367
kWh
$121
-
kW-mo/yr
-
02 2.4322: Use or replace with energy efficient substitutes $2,168 $4,000 $2,140
20,581
kWh
$28
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,086 $1,700 $1,048
10,075
kWh
$38
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,146 $7,700 $2,067
19,874
kWh
$79
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $460,500 $3,500,000 - - $460,500
TOTAL RECOMMENDED $469,283 $3,517,400 $8,517
81,897
kWh
$266
-
kW-mo/yr
$460,500
TOTAL IMPLEMENTED $468,197 $3,515,700 $7,469
71,822
kWh
$228
-
kW-mo/yr
$460,500
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs