| Assessment Year | 2022 |
|---|---|
| Principal Product | rolled, stamped, and bended sheet metal |
| NAICS | 332114: Custom Roll Forming |
| SIC | 3316: Cold-Rolled Steel Sheet, Strip, and Bars |
| Sales Range | $5 M to 10M |
| # of Employees | 75 |
| Plant Area |
100,000
ft2
|
| Annual Production | 4,950
ton
|
| Production Hrs. Annual | 5,330
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $123,469 | 2,208,720 |
kWh
|
$0.056 |
| Electricity Demand | $127,737 | 7,470 |
kW-mo/yr
|
$17.10 |
| Electricity Fees | $2,166 | - |
|
- |
| Natural Gas | $32,018 | 5,985 |
MMBtu
|
$5.35 |
| TOTAL YEARLY COSTS | $285,390 | |||
| RECOMMENDED SAVINGS* | $8,933 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $152 | $480 |
$147
2,453
kWh
|
$5
-
kW-mo/yr
|
- | - | |
| 02 | 2.7444: Close holes and openings in building such as broken windows | $1,354 | $6,000 | - | - |
$1,354
-
MMBtu
|
- | |
| 03 | 4.821: Pay bills on time to avoid late fees | $2,120 | - | - | - | - | $2,120 | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $421 | - |
$421
7,009
kWh
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,005 | $4,005 |
$3,005
50,081
kWh
|
- | - | - | |
| 06 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $1,452 | $1,180 | - | - |
$1,452
-
MMBtu
|
- | |
| 07 | 2.6218: Turn off equipment when not in use | $104 | - |
$104
1,727
kWh
|
- | - | - | |
| 08 | 2.6218: Turn off equipment when not in use | $326 | - |
$326
5,437
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $8,933 | $11,665 |
$4,002
66,706
kWh
|
$5
-
kW-mo/yr
|
$2,805
-
MMBtu
|
$2,120 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs