Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

183

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cut stone and stone products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0716 #02 Y:2005 Begin a practice of predictive / preventative maintenance $1,900 $200
OK0716 #01 Y:2005 Optimize plant power factor $10,863 $38,544
WI0460 #04 Y:2003 Use reverse osmosis to concentrate material $5,350 $10,000
WI0460 #03 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $6,616 $17,980
WI0460 #02 Y:2003 Utilize energy-efficient belts and other improved mechanisms $7,848 $6,708
WI0460 #01 Y:2003 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $65,381 $260,000
MI0031 #06 Y:2002 Utilize energy-efficient belts and other improved mechanisms $16,483 $1,137
MI0031 #05 Y:2002 Change procedures / equipment / operating conditions $18,813 $23,000
MI0031 #04 Y:2002 Reschedule plant operations or reduce load to avoid peaks $21,898 $1,820
MI0031 #03 Y:2002 Install soft-start to eliminate nuisance trips $30,176 $37,105
MI0031 #02 Y:2002 Use screening, magnetic separation to remove contaminants $38,400 $10,372
MI0031 #01 Y:2002 Consolidate freight shipments and/or deliveries $131,820 $30
GT0672 #06 Y:1999 Use power during off-peak periods $32,520 -
GT0672 #05 Y:1999 Use most efficient type of electric motors $3,071 $51,281
GT0672 #04 Y:1999 Filter and reuse hydraulic oil $1,950 $3,500
GT0672 #03 Y:1999 Maintain machines to reduce leaks $6,500 $5,000
GT0672 #02 Y:1999 Size electric motors for peak operating efficiency $9,897 $5,660
GT0672 #01 Y:1999 Reduce fluid flow rates $4,090 $600
GT0665 #06 Y:1999 Use power during off-peak periods $38,560 -
GT0665 #05 Y:1999 Use most efficient type of electric motors $4,023 $54,672