ITAC Assessment: GT0665
ITAC logo
ITAC Assessment: GT0665
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Aggregate Stone
NAICS
n/a
SIC 3281: Cut Stone and Stone Products
Sales Range $10
M
to 50
M
# of Employees 29
Plant Area 2,178,000
ft2
Annual Production 1,700,000
ton
Production Hrs. Annual 3,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,023 3,501,172
kWh
Electricity Demand $173,892 12,977
kW-mo/yr
Electricity Fees $15,475 -
Fuel Oil #2 $245,000 49,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $275,450 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4131: Size electric motors for peak operating efficiency $9,897 $5,660 $3,593
118,992
kWh
$5,744
-
kW-mo/yr
$560 - - - -
02 3.5111: Filter and reuse hydraulic oil $2,625 $3,500 - - - - - - $2,625
03 3.7311: Maintain machines to reduce leaks $6,500 $5,000 - - - - - - $6,500
04 4.445: Install equipment to move product $213,845 $700,000 $(-19,894.0)
(-586,460)
kWh
- - $43,815
-
MMBtu
$32,400 - $157,524
05 2.4133: Use most efficient type of electric motors $4,023 $54,672 $1,461
4,396
kWh
$2,301
-
kW-mo/yr
$261 - - - -
06 2.3137: Use power during off-peak periods $38,560 - - - - - - $38,560 -
TOTAL RECOMMENDED $275,450 $768,832 $(-14,840.0)
(-463,072)
kWh
$8,045
-
kW-mo/yr
$821 $43,815
-
MMBtu
$32,400 $38,560 $166,649
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs