ITAC Assessment: GT0677
ITAC logo
ITAC Assessment: GT0677
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Furniture
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 84,000
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 4,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,388 1,095,545
kWh
Electricity Demand $63,530 4,241
kW-mo/yr
Electricity Fees $2,409 -
Natural Gas $6,154 889
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $117,338 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 4.431: Train operators for maximum operating efficiency $61,146 $29,000 - - - - - $22,266 - $38,880
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,566 $4,150 $2,050
82,063
kWh
$3,516
-
kW-mo/yr
- - - - - -
03 2.4322: Use or replace with energy efficient substitutes $3,348 $1,630 $1,238
49,531
kWh
$1,921
-
kW-mo/yr
$189 - - - - -
04 2.6218: Turn off equipment when not in use $5,255 - $4,958
198,124
kWh
- $297 - - - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,851 $1,215 $1,421
56,858
kWh
$2,212
-
kW-mo/yr
$218 - - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,455 $21,857 $1,644
65,651
kWh
$2,559
-
kW-mo/yr
$252 - - - - -
07 4.514: Re-arrange equipment layout to reduce handling costs $10,175 $3,000 - - - - $175
-
lb
- $10,000 -
08 3.5313: Increase amount of waste recovered for resale $19,000 - - - - - $19,000
-
lb
- - -
09 3.8143: Recycle cleaning solvent and reuse $4,542 $4,000 $(-162.0)
(-2,052)
kWh
- - $1,470
-
gal
- - - $3,234
TOTAL RECOMMENDED $117,338 $64,852 $11,149
450,175
kWh
$10,208
-
kW-mo/yr
$956 $1,470
-
gal
$19,175
-
lb
$22,266 $10,000 $42,114
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs