ITAC Assessment: OK0716
ITAC logo
ITAC Assessment: OK0716
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Commercial aggregate
NAICS 327991: Cut Stone and Stone Product Manufacturing
SIC 3281: Cut Stone and Stone Products
Sales Range $1
M
to 5
M
# of Employees 31
Plant Area 1,000,000
ft2
Annual Production 1,900,000
ton
Production Hrs. Annual 5,824
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $191,173 5,511,600
kWh
Electricity Demand $158,115 23,302
kW-mo/yr
Electricity Fees $(-31,658.0) -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $(-13,244.0) *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.3212: Optimize plant power factor $10,863 $38,544 - $10,863
-
kW-mo/yr
- - - -
02 4.611: Begin a practice of predictive / preventative maintenance $1,900 $200 - - - $1,900 - -
03 4.111: Add equipment/ operators to reduce production bottleneck $(-28,676.0) - $(-15,087.0)
(-434,785)
kWh
- $(-13,599.0)
-
MMBtu
- - $10
04 2.7134: Use photocell controls $1,725 $125 $1,041
30,000
kWh
$684
-
kW-mo/yr
- - - -
05 2.7135: Install occupancy sensors $212 $475 $212
6,124
kWh
- - - - -
06 2.7261: Install timers and/or thermostats $579 $25 $579
16,697
kWh
- - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $153 $1,346 $92
2,662
kWh
$70
-
kW-mo/yr
- - $(-9.0) -
TOTAL RECOMMENDED $(-13,244.0) $40,715 $(-13,163.0)
(-379,302)
kWh
$11,617
-
kW-mo/yr
$(-13,599.0)
-
MMBtu
$1,900 $(-9.0) $10
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs