ITAC Assessment: WI0460
ITAC logo
ITAC Assessment: WI0460
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Silica Sand
NAICS 327991: Cut Stone and Stone Product Manufacturing
SIC 3281: Cut Stone and Stone Products
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area
n/a
Annual Production 1,000,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,601 4,194,000
kWh
Electricity Demand $90,095 8,682
kW-mo/yr
Electricity Fees $12,415 -
Natural Gas $496,060 96,173
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,464

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $65,381 $260,000 $40,440
1,200,000
kWh
$52,320
-
kW-mo/yr
$(-27,379.0)
-
MMBtu
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,848 $6,708 $4,839
143,605
kWh
$3,009
-
kW-mo/yr
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,616 $17,980 $6,616
196,329
kWh
- - - -
04 3.3132: Use reverse osmosis to concentrate material $5,350 $10,000 n/a - - - $6,000
-
Tgal
$(-650.0)
TOTAL RECOMMENDED $85,195 $294,688 $51,895
1,539,934
kWh
$55,329
-
kW-mo/yr
$(-27,379.0)
-
MMBtu
$6,000
-
Tgal
$(-650.0)
TOTAL IMPLEMENTED $14,464 $24,688 $11,455
339,934
kWh
$3,009
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs