Assessment Year | 2003 |
---|---|
Principal Product | Silica Sand |
NAICS | 327991: Cut Stone and Stone Product Manufacturing |
SIC | 3281: Cut Stone and Stone Products |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
n/a
|
Annual Production | 1,000,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $134,601 | 4,194,000 |
kWh
|
$0.032 |
Electricity Demand | $90,095 | 8,682 |
kW-mo/yr
|
$10.38 |
Electricity Fees | $12,415 | - |
|
- |
Natural Gas | $496,060 | 96,173 |
MMBtu
|
$5.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $85,195 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,464 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $65,381 | $260,000 |
$40,440
1,200,000
kWh
|
$52,320
-
kW-mo/yr
|
$(-27,379.0)
-
MMBtu
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,848 | $6,708 |
$4,839
143,605
kWh
|
$3,009
-
kW-mo/yr
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,616 | $17,980 |
$6,616
196,329
kWh
|
- | - | - | - | |
04 | 3.3132: Use reverse osmosis to concentrate material | $5,350 | $10,000 | n/a | - | - | - |
$6,000
-
Tgal
|
$(-650.0) |
TOTAL RECOMMENDED | $85,195 | $294,688 |
$51,895
1,539,934
kWh
|
$55,329
-
kW-mo/yr
|
$(-27,379.0)
-
MMBtu
|
$6,000
-
Tgal
|
$(-650.0) | ||
TOTAL IMPLEMENTED | $14,464 | $24,688 |
$11,455
339,934
kWh
|
$3,009
-
kW-mo/yr
|
- | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs