ITAC Assessment: MS0130
ITAC logo
ITAC Assessment: MS0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product kitchen appliances
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 150,000
ft2
Annual Production 32,400
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,593 3,444,607
kWh
Electricity Fees $(-33,782.0) -
Natural Gas $73,649 19,193
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,157 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.2437: Recover waste heat from equipment $821 $1,401 n/a - - $821
-
MMBtu
- - - -
02 2.7261: Install timers and/or thermostats $912 $944 n/a $1,101
20,809
kWh
$(-189.0) - - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,886 $170 n/a $2,277
43,083
kWh
$(-391.0) - - - - -
04 3.6124: Burn waste oil for heat $2,064 $2,389 n/a - - $64
-
MMBtu
- $2,000
-
gal
- -
05 3.5316: Contract a wood pallet recycling company $6,313 - n/a - - - - - $1,813
-
lb
$4,500
06 3.3125: Use distillation, evaporation to remove contaminants $2,161 $12,659 n/a $(-100.0)
(-1,758)
kWh
$17 - $2,244
-
Tgal
- - -
TOTAL RECOMMENDED $14,157 $17,563 $3,278
62,134
kWh
$(-563.0) $885
-
MMBtu
$2,244
-
Tgal
$2,000
-
gal
$1,813
-
lb
$4,500
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs