Assessment Year | 1997 |
---|---|
Principal Product | Manufactured Homes |
NAICS |
n/a
|
SIC | 2452: Prefabricated Wood Buildings and Components |
Sales Range | $50 M to 100M |
# of Employees | 458 |
Plant Area |
240,000
ft2
|
Annual Production | 2,854
pieces
|
Production Hrs. Annual | 5,145
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $82,999 | 2,783,705 |
kWh
|
$0.030 |
Electricity Demand | $2,778 | 609 |
kW-mo/yr
|
$4.56 |
Electricity Fees | $168 | - |
|
- |
Natural Gas | $63,782 | 13,296 |
MMBtu
|
$4.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,990 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,250 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.1172: Revise raw material specs | $32,300 | $104,000 | - | - | - | - |
$32,300
-
lb
|
- | |
02 | 3.1175: Use a different or recycled raw material | $17,270 | - | - | - | - | - |
$2,570
-
lb
|
$14,700 | |
03 | 3.5311: Recover and reuse waste material | $480 | - | - | - | - |
$480
-
gal
|
- | - | |
04 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $260 | - | - | - | - | - |
$260
-
lb
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $1,770 | $2,885 |
$1,260
46,600
kWh
|
$510
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | - | $2,000 | - | - | - | - | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $450 | $2,000 |
$320
12,016
kWh
|
$130
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $9,460 | $134,000 |
$3,350
123,974
kWh
|
$1,340
-
kW-mo/yr
|
$4,770
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $61,990 | $244,885 |
$4,930
182,590
kWh
|
$1,980
-
kW-mo/yr
|
$4,770
-
MMBtu
|
$480
-
gal
|
$35,130
-
lb
|
$14,700 | ||
TOTAL IMPLEMENTED | $2,250 | $4,885 |
$1,260
46,600
kWh
|
$510
-
kW-mo/yr
|
- |
$480
-
gal
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs