ITAC Assessment: GT0672
ITAC logo
ITAC Assessment: GT0672
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Aggregate Stone
NAICS
n/a
SIC 3281: Cut Stone and Stone Products
Sales Range $10
M
to 50
M
# of Employees 21
Plant Area 27,000,000
ft2
Annual Production 1,200,000
ton
Production Hrs. Annual 3,600
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,273 2,208,382
kWh
Electricity Demand $73,496 9,187
kW-mo/yr
Electricity Fees $10,546 -
Fuel Oil #2 $245,000 49,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,028 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,181

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.5123: Reduce fluid flow rates $4,090 $600 $4,090
127,784
kWh
- - - -
02 2.4131: Size electric motors for peak operating efficiency $9,897 $5,660 $3,809
118,992
kWh
$6,088
-
kW-mo/yr
- - -
03 3.7311: Maintain machines to reduce leaks $6,500 $5,000 - - - $6,500
-
gal
-
04 3.5111: Filter and reuse hydraulic oil $1,950 $3,500 - - $1,950
-
MMBtu
- -
05 2.4133: Use most efficient type of electric motors $3,071 $51,281 $1,230
36,928
kWh
$1,841
-
kW-mo/yr
- - -
06 2.3137: Use power during off-peak periods $32,520 - - - - - $32,520
TOTAL RECOMMENDED $58,028 $66,041 $9,129
283,704
kWh
$7,929
-
kW-mo/yr
$1,950
-
MMBtu
$6,500
-
gal
$32,520
TOTAL IMPLEMENTED $46,181 $56,881 $5,320
164,712
kWh
$1,841
-
kW-mo/yr
- $6,500
-
gal
$32,520
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs